WCSE 2022 Spring
ISBN: 978-981-18-5852-9 DOI: 10.18178/wcse.2022.04.114

An Improvement of Raw Material Incoming Inspection Process by Implement Lean and IE Techniques

Nutthanichcha Hemratthananon, Narucha Tanaiutchawoot, Nara Samattapapong

Abstract— The objective of this paper is productivity improvement by means of Lean Manufacturing Principles in the automotive manufacturing industry. Lean Manufacturing is a popular tool to be implemented in automotive industry fields for the purpose of achieving successful production goals and it is a well-organized method used to eliminate waste or non-value-added activities. In this paper, the author is focused on IE Techniques which are work study and ECRS technique. This was obtained by decreasing the manufacturing cost by reducing the cycle time of raw material incoming inspection process and reducing workforce. An improvement in a case study of automotive manufacturing company was achieved by minimizing the cycle time. The suggestion for improvement by changing the measuring equipment and changing the sequence of raw material incoming inspection process can reduce inspection time from 3.64 hours per lot to 1.70 hours per lot, introduce new automatic collect data equipment (U-WAVE) can reduce re-inspection time by human error from 70.94 hours to be zero hours and set up the new standard of raw material incoming inspection level can reduce inspection time from 390.83 hours to 16.03 hours.

Index Terms— productivity improvement, lean thinking, Waste(Muda), ECRS, Barnstorming.

Nutthanichcha Hemratthananon
System Engineering Program,School of Industrial Engineering,Suranaree University of Technology, Thailand
Narucha Tanaiutchawoot
System Engineering Program,School of Industrial Engineering,Suranaree University of Technology, Thailand
Nara Samattapapong
System Engineering Program,School of Industrial Engineering,Suranaree University of Technology, Thailand

[Download]


Cite: Nutthanichcha Hemratthananon, Narucha Tanaiutchawoot, Nara Samattapapong, " An Improvement of Raw Material Incoming Inspection Process by Implement Lean and IE Techniques, " WCSE 2022 Spring Event: 2022 9th International Conference on Industrial Engineering and Applications, pp. 980-987, Sanya, China, April 15-18, 2022.